top of page
Search

Lime Slaking System

  • May 13
  • 1 min read

Titan engineered, designed and fabricated a lime slaking for a South American project. The scope of work included the fabrication of 2 – 4’ x 5’ Titan Ball Mills and 2 – 2” Titan Vertical Tank Pumps. All components were assembled and test run at Titan’s facility prior to shipment.



 
 
 

Comments


bottom of page